Bi-directional test in bridge of Rio de Janeiro Metro
In 2014, Arcos ran a bi-directional test in a 1400-mm diameter, 36 m long drilled shaft pile in a bridge in Rio de Janeiro. The applied load was 40170 kN and it was used 6 Expancell to achieve the expected load...
-
São Paulo Monorail
Between the years 2011 and 2015, Arcos performed dozens of loading tests in the São Paulo’s Monorail.The tests were made mainly in bored piles, drilled shaft and full displacement, in several parts of the Monorail from the circulation lines to the stations...
-
Shipyard in Bahia
Between 2013 and 2014, Arcos ran 46 static loading tests at the same jobsite. It was the largest contract closed by Arcos and with the largest variety of piles tested, as screw piles, offshores and bored piles...