loading

Bi-directional test in bridge of Rio de Janeiro Metro

Bi-directional test in bridge of Rio de Janeiro Metro

  • CASE Prova de Carga Estática
  • LOCATION Rio de Janeiro - RJ - Brazil

project description

In 2014, Arcos ran a bi-directional test in a 1400-mm diameter, 36 m long drilled shaft pile in a bridge in Rio de Janeiro.

The applied load was 40170 kN and it was used 6 Expancell to achieve the expected load.



features of this project
  • Drilled shaft pile
  • 40170 kN applied load