WORKS
Bi-directional test in bridge of Rio de Janeiro Metro
Bi-directional test in bridge of Rio de Janeiro Metro
- CASE Prova de Carga Estática
- LOCATION Rio de Janeiro - RJ - Brazil
project description
In 2014, Arcos ran a bi-directional test in a 1400-mm diameter, 36 m long drilled shaft pile in a bridge in Rio de Janeiro.
The applied load was 40170 kN and it was used 6 Expancell to achieve the expected load.
features of this project
- Drilled shaft pile
- 40170 kN applied load