WORKS
Bi-directional tests on Railway Bridge in the State of Minas Gerais
Bi-directional tests on Railway Bridge in the State of Minas Gerais
- CASE Prova de Carga Estática
- LOCATION Minas Gerais - Brazil
project description
Between 2012 and 2013 Arcos performed 05 Bi-directional tests on drilled shaft and Offshore drilled shaft piles on a Railway Bridge. The load applied was up to 15000 kN and the pile’s depth around 50 m.
features of this project
- Offshore drilled shaft