WORKS
Bridge in São Paulo
Bridge in São Paulo
- CASE Prova de Carga Estática
- LOCATION São Paulo - SP - Brazil
project description
Arcos performed in 2015, a bi-directional test on a 2.0 m diameter drilled shaft pile in São Paulo that reached up to 54950 kN of load applied.
features of this project
- Drilled Shaft