loading

Bridge in São Paulo

Bridge in São Paulo

  • CASE Prova de Carga Estática
  • LOCATION São Paulo - SP - Brazil

project description

Arcos performed in 2015, a bi-directional test on a 2.0 m diameter drilled shaft pile in São Paulo that reached up to 54950 kN of load applied.



features of this project
  • Drilled Shaft